Ibri IPP Ibri IPP Ibri IPP

Ibri IPP

Ibri IPP

OVERVIEW

1509 MW natural gas fired IPP for a concession of 15 years under develop, finance, design, engineer, construct, own, operate and maintain structure. Natural gas will be the primary fuel for electricity generation, with fuel oil used as a back-up option.

KEY FACTS

  • FUEL
    Natural Gas
  • LOCATION
    Ibri, Oman
  • OFFTAKER
    OPWP
  • POWER
    1509 MW, CCGT
  • TECHNOLOGY
    CCGT
  • PROJECT COST
    USD 982 Mn
  • COMMERCIAL OPERATIONAL DATE
    Q2 2019
  • ACWA POWER SHARE
    44.90%
  • OFFTAKE CONTRACT
    PPA-BOO 15 years
  • OTHER INVESTORS
    Mitsui (50.1%), DIDIC (5%)
  • EPC
    SEPCO III & Power China
  • O&M
    Dhofar O&M Co (Subcontracted to NOMAC)
  • PROJECT COMPANY
    Ad-Dhahirah Generating Company SAOC ("Ibri")