OVERVIEW

The Karakalpakstan 1500 MW Wind + BESS project is a greenfield Independent Power Project IPP that is developed by ACWA Power in the Republic of Uzbekistan.

ACWA Power and the JSC National Electrical Grid of Uzbekistan signed the binding Heads of Terms for the development/construction/operation of a 1500 MW onshore wind power plant including a battery energy storage system (“BESS”). JSC National Electric Grid of Uzbekistan shall act as the sole off-taker for the project under a 25 year PPA.

The project will be located in the Karakalpakstan region in the north-west of Uzbekistan, and will be developed as a ‘Build, Own, Operate, Transfer’ project. ACWA Power will take the lead in developing, financing, constructing, engineering, operating and maintaining the plant.

KEY FACTS

  • LOCATION
    Karakalpakstan Region, Uzbekistan
  • OFFTAKER
    JSC National Electric Grid of Uzbekistan (NEGU)
  • CAPACITY
    1500 MW wind + 300 MW BESS
  • TECHNOLOGY
    Onshore Wind plus BESS
  • PROJECT COST
    USD 1550 Mn
  • ACWA POWER SHARE
    100%
  • OFFTAKE CONTRACT
    25-year PPA BOO(T)
  • O&M
    NOMAC
  • COMMERCIAL OPERATIONAL DATE
    Q1 2027